Informational Technologies

Perspective Plans for IT Development

Development and support of business appendices:

  • Implementation of the pilot project on the video multiport conference organization between JSC "IDGC Holding" and JSC "Lenenergo" branches;
  • Development of Geoinformation system of branches of JSC "Lenenergo" regarding the analysis of connection of consumers with use of the data of system;
  • Creation of system of protection of the personal data, to execute the Federal Law of the Russian Federation as of 27.07.2006 No.152-FZ "About the personal data", and also with a view of reduction of the order of handling of the personal given clients and employees of JSC "Lenenergo";
  • Implementation of the automated control system by deliveries and stocks intended for accounting, planning and management of material resources;
  • Modernization of server equipment of the Company, designing of a new Data-processing centre;
  • Modernization of the automated system for administrative document circulation aimed at quality enhancement:
    • Conducting of accounting and mailing of documents to External and Internal addressees of the Company;
    • Control and analysis of the processes of preparation and execution of documents, resolutions and orders within the limits of Company document circulation.
  • Implementation of the project of provision of facilities of JSC "Lenenergo" by reserve communication channels for increase of reliability of work of the power supply system;
  • Introduction of managerial processes of information technologies, according to ITIL version 3 recommendations aimed to increase of overall performance of IT Divisions and contractors of the Company.

Automated Process Control Systems:

  • Automated Process Control Systems of dispatching management of control offices 1 and 2 ВВР of JSC "Lenenergo" branch "Cable network" are constructed.
  • At implementation of the Programs of tele-mechanization of substations of JSC "Lenenergo" for 2011-2017, there should be designed:
    • Telemechanics on substations of 110, 35 kV in JSC "Lenenergo" branches;
    • Telemechanics on RTS of 10 (6) kV, TS of 10 (6) kV in JSC "Lenenergo" branch "Cable network";
    • Operatively information managing complexes (OIMC) in the load dispatcher centers of JSC "Lenenergo" branches "Luga PDN" and "Novaya Ladoga PDN", in the load dispatcher center of Lomonosov, Krasnoe Selo and Tosno RPC of JSC "Lenenergo" branch "Gatchina PDN", Sosnov and Priozersk RPC of JSC "Lenenergo" branch, "Vyborg PDN", Volkhov and Kirishi RPC of JSC "Lenenergo" branch, "Novaya Ladoga PDN" and Podporozhsk RPC of JSC "Lenenergo" branch "Lodeynoe Pole PDN".

Communication:

  • Program accomplishment on replacement defective cord cables for 2011;
  • To execute building of transit communication line between St. Petersburg and Vyborg;
  • To execute building of the basic and reserve communication lines on SS 58А of PINPh (Petersburg Institute of Nuclear Physics);
  • Modernization of technological mobile radio communication in St. Petersburg and Gatchina is planned;
  • Connection of all areas of electric networks and masterful sites of JSC "Lenenergo" to the corporate network of data transmission is planned.