Appendices

Information on the Introduction of Partial and Complete Limitation in Electric Power Consumption to Non-paying Customers on the Request of Power Sales Companies

JSC “Lenenergo”, including: Saint Petersburg Leningrad Region
Number of the applications sent by JSC “Lenenergo", pcs. 1837 1212 625
Performed, pcs. 11000 6665 3335
Grid company’s failure to perform. pcs. 1176 1105 771
including on the following ground:            



— absence of engineering capability of switching off1046242
— facilities referred to the “List” of Appendix #6 of Government Decree dated 31.08.2010 000
— absence of act of emergency reserved quota  000
— connection to the grids of other proprietors743
Including visit of brigade in vain, without implementation of restriction total, pcs. 665 848 117
including:



— through the fault of JSC “Lenenergo” 000
— through the fault of ESC 557443114
— undersupply of consumer853
ESC cancellation 661 442 219
Top